Tell us the shape of the move — size, people, desks, cabling, equipment — and answer a plain-English readiness checklist. You get a T-minus move plan with anything at risk on your actual timeline flagged, a readiness score, and a proposed scope. Keep it as a PDF, or send it to PTS for a free move review and a costed plan.
- A week-by-week T-minus plan for your move — with at-risk flags against your real runway
- A readiness checklist that knows what applies to your move (and what doesn't)
- What you'll likely need, traceable to your answers — no prices, no obligation
- Your own PDF move plan; nothing leaves your browser unless you submit
Your move
Ten quick questions about the move — size, people, desks, the state of the space, cabling and equipment. They shape the checklist, the plan and the readiness assessment. No IT knowledge needed.
Readiness checklist
Answer from what's actually agreed and ordered — not what's intended. "Not sure" is a perfectly good answer; those become the "check first" list, and anything unready inside your runway gets flagged on the plan.
Connectivity
Space & design
Equipment & moving
The weekend & after
Your move plan
The week-by-week schedule for a move like yours — 11–50 people · 11–50 desks · 2,000–5,000 sq ft · 3–6 months · within hong kong · new cabling · a mix. Items your answers already cover are ticked; anything unconfirmed whose start point is already inside your runway is flagged at risk.
Leased line or broadband ordered for the new address; delivery date in writing. If the runway is short, order a fast interim service alongside the real one.
Points per desk from the floor plan, Wi-Fi drops, rack location with power and cooling — issued to the fit-out team as a drawing, not an email.
Containment, power and cooling in the contractor's programme; IT walk-through booked at first fix.
Network, firewall, screens, docks — ordered against checked lead times, delivered to the right place.
First fix alongside the contractor; every run labelled; certification booked.
Screens, audio, cameras and booking panels designed per room — ordered with the same lead-time discipline as the network.
Predictive design or survey against the actual walls; AP positions onto the cabling drawing.
Specialist handling for servers, NAS, screens and AV agreed in writing — who unracks, who racks, who carries the risk.
Porting requests lodged; call flows for move weekend agreed (divert plan if anything slips).
New circuits proven end-to-end, cabling certificates in hand, racks built and powered — before anything depends on them.
Installed and tested while the office is still empty — access cards issued before day one.
Full backups restore-tested; the move-weekend runbook agreed: shutdown order, transport, rack-up order, test plan, who calls whom.
Every desk numbered against the patch schedule; staff told what to pack, what not to touch, and what Monday looks like.
Shutdown → transport → rack and patch → core services up → desk-by-desk checks → sign-off against the runbook.
Snag list worked down with on-site support surge; old circuits cancelled, cabling made good, disposal certificates filed.
Your move readiness
11–50 people · 11–50 desks · 2,000–5,000 sq ft · 3–6 months · within hong kong · new cabling · a mix
What you'll likely need
Built from the shape of your move — each item says why it's there. A scope, not a quote: PTS validates it in a free move review and returns a costed plan.
Office move IT management
The whole move run as a project — design, vendors, cutover weekend and day-one support under one accountable owner.
Because you told us: every move needs one owner for the IT critical path.
Structured cabling design & build
Cabling designed from your floor plan, installed with the fit-out, certified and labelled — done once, done right.
Because you told us: you need a new cabling design & build; no cabling design exists yet.
Circuits & connectivity
The right circuits ordered early, interim options if the runway is short, and a tested line before anyone depends on it.
Because you told us: internet circuits aren't confirmed ordered — the longest lead time in the move.
Wi-Fi design
Predictive design or on-site survey against the real floor plan, so coverage works on day one.
Because you told us: Wi-Fi hasn't been designed for the new space.
Meeting rooms & AV
Rooms designed, installed and tested as rooms people actually book — Teams/Zoom, audio, one-touch join.
Because you told us: meeting room AV isn't designed yet.
IT procurement for the move
New equipment specified, competitively sourced and delivered against the move schedule — vendor-neutral.
Because you told us: part of the estate is being replaced.
Day-one support & aftercare
Engineers on the floor on day one, a snag list worked to zero, and ongoing support once the dust settles.
Because you told us: the first week decides how the move is remembered.
Get your free move review — and a costed plan
Send this to PTS and within two business days we'll come back to arrange a free move review — an engineer walks the plan and the floor plan with you — then a costed, sequenced proposal. Your move profile, plan flags and answers are attached automatically.
The PTS Office Move IT Planner is a planning aid. Lead times vary by carrier, building and season — treat the T-minus plan as indicative until validated against quotations and your building's rules. PTS Managed Services Limited — ISO/IEC 27001 and ISO/IEC 20000 certified. Current at 26 August 2026. See also our office relocation service and the IT Maturity Assessment.